Promotions:

FREE Threat Assessment

Find out what is getting through your security systems with a FREE threat assessment

Latest News:

Code Red - The latest zero day vulnerability, the Heartbleed Bug in the OpenSSL cryptographic library. Affects tech providers using OpenSSL's 1.0.1 and the 1.0.2-beta release.

Platform Updates:

Version 1.2: Intrusion Detection

Client Login
Sign on Register Forgot?
  • 01924 919241
Home / Our Hosting

Our Hosting Cloud Services

panosec hosting and cloud services

Every aspect of PanoSec's datacentre infrustructure is meticulously controlled. From the land to the power, network and servers. This careful planning and attention to detail means we can confidently stand behind the quality of the facilities and services we provide. Our main Tier 4 datacentres are located in York and Manchester.

Our datacentres allow us to offer cloud hosting, managed hosting and services.

POWER

1 MVA power supply from a dedicated substation connected to an 11kV distribution ring.

55kVa generator with 24 hour runtime and a 6 hour fuel supply contract.

UPS capacity of 100kVA with n +1 resiliency - expandable to 500 kVA

COOLING

90kW of n +1 cooling, designed to grow ro 450 kW in n+1 mode.

Fresh air cooling when exterior ambient temperature is below 21.5C to minimise electricity usage.

Racks arranged in contained cold aisle with ceiling tiles, doors and blanked racks to minimise air leakage.

NETWORK

Diverse entry points into the building.

Fibre routed diversely out of the building.

Three 10 GBps dedicated connections from our building to the rest of our national network.

SAFETY & SECURITY

Staff on call 24/7

Very Early Smoke Detection and Alarm system (VESDA)

Double knock fire detection system connected to non-destructive fire suppression system using FM200 gas.

24/7 security with remotely monitored CCTV connected to security and police response.

Access control system for entry and control within the building.

FEATURES:

  • Managed hosting, virtual servers and associated services.
  • On-Site generator offers a minimum 24 hour run time with a six-hour fuel supply contract in case of electricity supply failure.
  • UPS system (operating in n+1 mode) provides a clean electrical supply and supplies bridging power during the generator startup.
  • High-efficiency fresh air economiser means the data floor can be cooled by the fresh Yorkshire air when the external temperature is below 21.5C.
  • Underfloor cooling, combined with a contained "cold aisle", ceiling tiles, doors and blanked racks means Y026 can operate at a PUE of < 1.2.
  • Dedicated building management system allowing for tracking of full historical temperature, energy usage and PUE.

HOSTING LOCATIONS:

  • Tier 4
  • 1. Bytemark, 2 Opus Ave, York.
  • 2. Telicity Group, Reynolds House, Manchester.
  • Tier 3
  • 3. With Support, 8 First Street, Huddersfield.
  • 4. With Support, Dewesbury Rd, Leeds.


View this hosting information as a PDF